Planning Commission — Thursday, October 24, 2019
This is the plain-text record. Open this meeting in the interactive archive for video timestamps, search and vote comparisons.
How to attend or watch
Due to the COVID-19 crisis, meetings of the Lake County Planning Commission will be available for participation virtually via Zoom. Live video of all Planning Commission meetings are broadcast on Lake County PEG TV (TV8) , and online, at :
Please click this URL to join.
To submit a written comment on any agenda item please visit: https://countyoflake.legistar.com/Calendar.aspx and click on the eComment feature linked to the meeting date.
Please click this URL to join.
To submit a written comment on any agenda item please visit: https://countyoflake.legistar.com/Calendar.aspx and click on the eComment feature linked to the meeting date.
1.9:00 AM - Call To Order
2.Pledge of Allegiance
3.Verification of Legal Notice
4.Consent Agenda
4a.Consideration of approval of minutes from June 27, 2019 Planning Commission Meeting.
Action Item
4b.Consideration of approval of minutes from the July 11, 2019 Planning Commission Meeting.
Action Item
4c.Consideration of approval of minutes from the August 8, 2019 Planning Commission Meeting.
Action Item
4d.Consideration of approval of minutes from September 12, 2019 Planning Commission Meeting.
Action Item
4e.Consideration of approval of minutes from September 26, 2019 Planning Commission Meeting.
Action Item
5.Public Input
6.Timed Items - Public Hearings
6a.9:05 a.m. Public Hearing on consideration of a Major Use Permit (UP 19-14), Variance (VR 19-03) and Categorical Exemption (CE 19-28). The project applicant is OPHRIA PROCESSING LLC proposing Type 6 non-volatile cannabis oil extraction in an existing structure and Type 11 Cannabis Distributor License. The project is located at 109 Soda Bay Road, Lakeport and further described as APN 008-019-60. (Byron Turner)
Public Hearing
Staff memo
EXECUTIVE SUMMARY:
Ophira Processing, LLC is a cannabis processor, proposing to take the raw cannabis plant and extracting oils using food grade ethanol. The resulting oil will be sold wholesale for use in cannabis consumer products including concentrates, topicals, and edibles. The processing (manufacturing) will take place in an existing 3,555 sq. ft. structure, which was used in the past as an appliance repair shop, and other industrial uses.
Ophira Processing, LLC intends to process approximately 5,000 lbs of biomass a month or 15,000 lbs per quarter. The anticipated workflow allows for the monthly input of biomass to be delivered on the first of the month. The biomass will be completely processed and deemed useless by the last day of the month and will be picked up for disposal. There will be very little traffic associated with the business as no customers will have access to the facility and deliveries are limited to one or two days per month. The vehicle used for deliveries will be the size of a cargo van.
EXTRACTION PROCESS
Ethanol extraction is a process that has been used to create natural by-products from many different types of plants in order to collect desirable compounds while leaving behind the undesirable compounds and unusable plant material. The applicant proposes food grade ethyl alcohol to extract cannabinoids and terpenes. These compounds provide the aroma, flavor and effect of the final product.
Ethanol extraction is a single-stream process that can be conducted under warm or cold conditions. This technique essentially uses alcohol that has been significantly cooled and then drips through the packed flower material, stripping the cannabinoids and terpenes during the process. Distillation then separates the cannabinoids from the alcohol creating a pure, solvent free extract. The advantage to this approach is that the extraction is time efficient and of relatively low solvent-to-feed ratio. Ethanol is a solvent capable of extracting cannabinoids and terpenes efficiently. It also has a relatively low boiling point, which makes it easy to remove from the final product, and a favorable toxicological profile including FDA limits in the range of 0.5 percent. Overall, ethanol extraction is an effective process most suited to high-throughput, bulk-processing laboratories that focus on a few products.
The FDA classifies ethanol as Generally Regarded as Safe (GRAS), meaning that it is safe for human consumption. As a result, it is commonly used as a food preservative and additive, found in everyday foods.
Summary of Steps
1. Biomass: pulverize dry plant material (flower/trim).
2. Wash: combine the biomass and cold food grade ethanol. The cold temperature locks in chlorophyll & waxes to the plant material, which eliminates a secondary removal process.
3. Filtration: passing the crude extract through filters to remove any impurities.
4. Distillation: separating the ethanol from the cannabinoids.
5. Quality check and testing.
6. Offered as a wholesale product to end product manufacturers.
Staff recommends approval of Major Use Permit (UP 19-14) and Variance (VR 19-03) for Ophira Processing, to manufacture and distribute wholesale cannabis oil (Type 6 Non-Volatile), (Type 11 Distributor License)
RECOMMENDED ACTION:
Sample Motions:
Categorical Exemption
I move that the Planning Commission find that the Use Permit, UP 19-14 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 is exempt from CEQA because it falls within Categorical Exemption Class 1 set forth in the Staff Report dated September 19, 2019.
Major Use Permit
I move that the Planning Commission find that the Use Permit, UP 19-14 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 does meet the requirements of Section 51.4 and Section 27(av) of the Lake County Zoning Ordinance and grant the Major Use Permit subject to the conditions and with the findings listed in the Staff Report dated September 19, 2019.
Variance
I move that the Planning Commission find that the Variance 19-04 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 meets the requirements in Article 52 of the Lake County Zoning Ordinance subject to the conditions and with the findings listed in the Staff Report dated September 19, 2019.
NOTE: The applicant or any interested person is reminded that the Zoning Ordinance provides for a seven (7) calendar day appeal period. If there is a disagreement with the Planning Commission, an appeal to the Board of Supervisors may be filed. The appropriate forms and applicable fee must be submitted prior to 5:00 p.m. on or before the seventh calendar day following the Commission's final determination
Original memo text
..Title
..Body
MEMORANDUM
TO: Planning Commission
FROM: Michalyn DelValle, Community Development Director
Byron Turner, Principal Planner
DATE: September 23, 2019
SUBJECT: Major Use Permit, UP 19-14, Variance VR 19-03, Categorical Exemption, CE 19-28 Supervisor District 4
ATTACHMENTS: 1. Vicinity Map
2. Site Plan
3. Floor Plan
4. Project Description and Management Plans (Available upon request)
5. Proposed Conditions of Approval
6. Agency Comments
EXECUTIVE SUMMARY:
Ophira Processing, LLC is a cannabis processor, proposing to take the raw cannabis plant and extracting oils using food grade ethanol. The resulting oil will be sold wholesale for use in cannabis consumer products including concentrates, topicals, and edibles. The processing (manufacturing) will take place in an existing 3,555 sq. ft. structure, which was used in the past as an appliance repair shop, and other industrial uses.
Ophira Processing, LLC intends to process approximately 5,000 lbs of biomass a month or 15,000 lbs per quarter. The anticipated workflow allows for the monthly input of biomass to be delivered on the first of the month. The biomass will be completely processed and deemed useless by the last day of the month and will be picked up for disposal. There will be very little traffic associated with the business as no customers will have access to the facility and deliveries are limited to one or two days per month. The vehicle used for deliveries will be the size of a cargo van.
EXTRACTION PROCESS
Ethanol extraction is a process that has been used to create natural by-products from many different types of plants in order to collect desirable compounds while leaving behind the undesirable compounds and unusable plant material. The applicant proposes food grade ethyl alcohol to extract cannabinoids and terpenes. These compounds provide the aroma, flavor and effect of the final product.
Ethanol extraction is a single-stream process that can be conducted under warm or cold conditions. This technique essentially uses alcohol that has been significantly cooled and then drips through the packed flower material, stripping the cannabinoids and terpenes during the process. Distillation then separates the cannabinoids from the alcohol creating a pure, solvent free extract. The advantage to this approach is that the extraction is time efficient and of relatively low solvent-to-feed ratio. Ethanol is a solvent capable of extracting cannabinoids and terpenes efficiently. It also has a relatively low boiling point, which makes it easy to remove from the final product, and a favorable toxicological profile including FDA limits in the range of 0.5 percent. Overall, ethanol extraction is an effective process most suited to high-throughput, bulk-processing laboratories that focus on a few products.
The FDA classifies ethanol as Generally Regarded as Safe (GRAS), meaning that it is safe for human consumption. As a result, it is commonly used as a food preservative and additive, found in everyday foods.
Summary of Steps
1. Biomass: pulverize dry plant material (flower/trim).
2. Wash: combine the biomass and cold food grade ethanol. The cold temperature locks in chlorophyll & waxes to the plant material, which eliminates a secondary removal process.
3. Filtration: passing the crude extract through filters to remove any impurities.
4. Distillation: separating the ethanol from the cannabinoids.
5. Quality check and testing.
6. Offered as a wholesale product to end product manufacturers.
Staff recommends approval of Major Use Permit (UP 19-14) and Variance (VR 19-03) for Ophira Processing, to manufacture and distribute wholesale cannabis oil (Type 6 Non-Volatile), (Type 11 Distributor License)
RECOMMENDED ACTION:
Sample Motions:
Categorical Exemption
I move that the Planning Commission find that the Use Permit, UP 19-14 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 is exempt from CEQA because it falls within Categorical Exemption Class 1 set forth in the Staff Report dated September 19, 2019.
Major Use Permit
I move that the Planning Commission find that the Use Permit, UP 19-14 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 does meet the requirements of Section 51.4 and Section 27(av) of the Lake County Zoning Ordinance and grant the Major Use Permit subject to the conditions and with the findings listed in the Staff Report dated September 19, 2019.
Variance
I move that the Planning Commission find that the Variance 19-04 applied by Ophira Processing, LLC on property located at 109 Soda Bay Road, Lakeport, CA 95453 further described as APN: 008-019-60 meets the requirements in Article 52 of the Lake County Zoning Ordinance subject to the conditions and with the findings listed in the Staff Report dated September 19, 2019.
NOTE: The applicant or any interested person is reminded that the Zoning Ordinance provides for a seven (7) calendar day appeal period. If there is a disagreement with the Planning Commission, an appeal to the Board of Supervisors may be filed. The appropriate forms and applicable fee must be submitted prior to 5:00 p.m. on or before the seventh calendar day following the Commission's final determination
6b.9:30 a.m. Public Hearing on consideration of a Major Use Permit (UP 19-09). The project applicant is VALLEY OAKS LAND DEVELOPMENT proposing a Major Use Permit for a new 18,000 sq. ft. grocery store (Grocery Outlet) and new access road. The project is located at 18196 & 18426 S. State Highway 29 and 18765 Hartmann Rd., Hidden Valley, CA and further described as APNs 014-260-51, 014-260-24 and 014-260-36. Environmental Evaluation: Previously approved EIR and Addendum. (Byron Turner)
Public Hearing
Staff memo
EXECUTIVE SUMMARY:
The developer, Valley Oaks Land Development is proposing to construct an approximately 18,000 square foot retail store for Grocery Outlet, on a parcel that currently totals approximately 47 acres. A new access road will be constructed on a neighboring property which is approximately 17 acres in size. The site is currently zoned Planned Development Commercial (PDC), and was previously analyzed by Specific Plan of Development UP 07-05, which included 120,000 Sq. Ft. of retail commercial. Condition of Approval 13 of UP 07-05 states:
"To recognize fluctuating economic and other conditions, the applicant shall submit an application for a use permit for single phase or parcel or multiple phases or parcel plans for orderly development of the Valley Oaks Project. These plans shall be called a "Specific Subplan of Development". The permit fee shall be set forth in a fee schedule adopted by the Board of Supervisors. Each Specific Subplan of Development must include a detailed Specific Subplan of Development for the phase or parcel(s) being developed and (ii) items reasonably required by these conditions or any modifications hereto. The first Specific Subplan of Development for any parcel or phase or multiple phases or parcels shall require a major use permit. Subsequent plans shall require a minor or major use permit as provided in County Code."
This Use Permit UP 19-09 is the 1st Specific Subplan of Development for the Valley Oaks project.
The project site is located at the intersection of Highway 29 and Hartmann Road, with a new access proposed off of Hartmann Road named Oak Meadow Drive. While the original plan and approved project connected to the new roundabout, the applicant does not have access at this time. As proposed the project consists of ninety-two paved parking spaces, with an additional 4 ADA parking spaces and would provide circulation for delivery trucks to occur facing Highway 29. A trash enclosure, lighting, and a detention basin is proposed as part of the project. Landscaping is required throughout the unpaved areas, and along Highway 29 and Hartmann Road.
The site is designed to accommodate future additional commercial development, although this Major Use Permit is for the Grocery Outlet and new access road only.
A Major Use Permit is required for this project pursuant the Conditions of Approval of the Specific Plan of Development. The Review authority may only approve or conditionally approve a major use permit if all of the findings listed in Article 51 of the Lake County Zoning Ordinance are made. The applicant is requesting several deviations in the previously approved Conditions of Approval.
See the attached site plan and architectural renderings, and sign plan for more detailed information regarding the proposed project.
RECOMMENDED ACTION:
Sample Motions
Addendum to EIR
I move that the Planning Commission certify that the Addendum to the Environmental Impact Report prepared by the Planning Division for the Valley Oaks project Phase 1 has been completed in compliance with CEQA and Section 15164 of the State CEQA Guidelines.
Use Permit Approval
I move that the Planning Commission find that the Use Permit (UP 19-09) applied for by Kimco Inc. on property located at Highway 29 and Hartmann Road, Hidden Valley, Middletown 18196 and 18426 South State Highway, Middletown, and 18765 Hartmann Rd., APN 014-260-51, 14-260-24, 14-260-36, does meet the requirements of Section 51.4 of the Lake County Zoning Ordinance and that the Planning Commission has reviewed and considered the EIR and Addendum which was adopted for this project and the Use Permit be granted subject to the conditions and with the findings listed in the staff report dated October 10, 2019.
NOTE: The applicant or any interested person is reminded that the Zoning Ordinance provides for a seven (7) calendar day appeal period. If there is a disagreement with the Planning Commission, an appeal to the Board of Supervisors may be filed. The appropriate forms and applicable fee must be submitted prior to 5:00 p.m. on or before the seventh calendar day following the Commission's final determination.
Original memo text
..Title
..Body
MEMORANDUM
TO: Planning Commission
FROM: Michalyn DelValle, Community Development Director
Prepared by: Byron Turner, Principal Planner
DATE: October 10, 2019
SUBJECT: Valley Oaks Grocery Outlet; UP 19-09, and addendum to EIR
Supervisor District 1
ATTACHMENTS: 1. Vicinity Map
2. Site Plan
3. Building Elevations
4. Agency Comments
5. Use Permit Conditions
6. CEQA Addendum and MMRP
7. EIR Available Upon Request
EXECUTIVE SUMMARY:
The developer, Valley Oaks Land Development is proposing to construct an approximately 18,000 square foot retail store for Grocery Outlet, on a parcel that currently totals approximately 47 acres. A new access road will be constructed on a neighboring property which is approximately 17 acres in size. The site is currently zoned Planned Development Commercial (PDC), and was previously analyzed by Specific Plan of Development UP 07-05, which included 120,000 Sq. Ft. of retail commercial. Condition of Approval 13 of UP 07-05 states:
"To recognize fluctuating economic and other conditions, the applicant shall submit an application for a use permit for single phase or parcel or multiple phases or parcel plans for orderly development of the Valley Oaks Project. These plans shall be called a "Specific Subplan of Development". The permit fee shall be set forth in a fee schedule adopted by the Board of Supervisors. Each Specific Subplan of Development must include a detailed Specific Subplan of Development for the phase or parcel(s) being developed and (ii) items reasonably required by these conditions or any modifications hereto. The first Specific Subplan of Development for any parcel or phase or multiple phases or parcels shall require a major use permit. Subsequent plans shall require a minor or major use permit as provided in County Code."
This Use Permit UP 19-09 is the 1st Specific Subplan of Development for the Valley Oaks project.
The project site is located at the intersection of Highway 29 and Hartmann Road, with a new access proposed off of Hartmann Road named Oak Meadow Drive. While the original plan and approved project connected to the new roundabout, the applicant does not have access at this time. As proposed the project consists of ninety-two paved parking spaces, with an additional 4 ADA parking spaces and would provide circulation for delivery trucks to occur facing Highway 29. A trash enclosure, lighting, and a detention basin is proposed as part of the project. Landscaping is required throughout the unpaved areas, and along Highway 29 and Hartmann Road.
The site is designed to accommodate future additional commercial development, although this Major Use Permit is for the Grocery Outlet and new access road only.
A Major Use Permit is required for this project pursuant the Conditions of Approval of the Specific Plan of Development. The Review authority may only approve or conditionally approve a major use permit if all of the findings listed in Article 51 of the Lake County Zoning Ordinance are made. The applicant is requesting several deviations in the previously approved Conditions of Approval.
See the attached site plan and architectural renderings, and sign plan for more detailed information regarding the proposed project.
RECOMMENDED ACTION:
Sample Motions
Addendum to EIR
I move that the Planning Commission certify that the Addendum to the Environmental Impact Report prepared by the Planning Division for the Valley Oaks project Phase 1 has been completed in compliance with CEQA and Section 15164 of the State CEQA Guidelines.
Use Permit Approval
I move that the Planning Commission find that the Use Permit (UP 19-09) applied for by Kimco Inc. on property located at Highway 29 and Hartmann Road, Hidden Valley, Middletown 18196 and 18426 South State Highway, Middletown, and 18765 Hartmann Rd., APN 014-260-51, 14-260-24, 14-260-36, does meet the requirements of Section 51.4 of the Lake County Zoning Ordinance and that the Planning Commission has reviewed and considered the EIR and Addendum which was adopted for this project and the Use Permit be granted subject to the conditions and with the findings listed in the staff report dated October 10, 2019.
NOTE: The applicant or any interested person is reminded that the Zoning Ordinance provides for a seven (7) calendar day appeal period. If there is a disagreement with the Planning Commission, an appeal to the Board of Supervisors may be filed. The appropriate forms and applicable fee must be submitted prior to 5:00 p.m. on or before the seventh calendar day following the Commission's final determination.
7.Non-Timed Items
8.Department Update
9.Adjournment